FABRIC-2.md: F.3 punch list -- rule to wait for Artemis before DoE/ACL-RWT re-measurement
Captain Bob went with the recommended path rather than measuring now: item 5.1 + ACL-RWT overhead re-measurement stays deferred until Artemis lands, since Artemis's own storage/timing work would immediately perturb whatever baseline gets captured today. The other F.3 item (4.4s -> 1.11 -> 4.3 -> S17.4 chain) is unchanged -- still genuinely blocked on ACL Phase 8, no ruling needed there. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Sonnet 5
parent
413b5a9bbf
commit
eaf3f8c9ae
+3
-1
@@ -919,7 +919,9 @@ redirect to `FABRIC.md`/`FABRIC-2.md`. Nothing left pending in this track.
|
||||
|
||||
- [ ] 4.4s → 1.11 → 4.3 → §17.4 chain — no ruling needed, just unstarted work blocked on ACL
|
||||
Phase 8 (identity storage), out of this pass's scope
|
||||
- [ ] 5.1 (DoE re-run) + ACL-RWT re-measurement — run now, or wait for Artemis (recommended)?
|
||||
- [ ] 5.1 (DoE re-run) + ACL-RWT re-measurement — **RULED 2026-08-19, Captain Bob: go with
|
||||
the recommended path.** Wait for Artemis to land before re-running; measuring now risks
|
||||
a baseline that Artemis's own storage/timing work immediately perturbs. Not started.
|
||||
|
||||
(§12 Q5 was listed here too as of this writing; removed 2026-08-18 — it was already closed
|
||||
under Section F's `STADIUM_CAPACITY_TICK` writeup and Section D's checkbox, both dated
|
||||
|
||||